Skip to content
NORR
Industrial

Granite Barry Callebaut Chocolate Factory

Granite REIT transformed a 92-acre former quarry and asphalt plant into the resulting Telephone City Logistics Centre, a master-planned high-density manufacturing and logistics hub in Brantford, ON.

Client Granite REIT
Size 452,621 SF (42,050 SM)
Location Brantford, ON, Canada
Date 2021 (Master Plan)
2024 (Base Building)
2025 (Tenant Fit-Out)
Rating
Two Green Globes®
Main office entrance at Telephone City Logistics Centre featuring glazing and contemporary industrial design.

Challenge

Transforming a former industrial site into a modern logistics and manufacturing campus required balancing redevelopment, operational performance, and sustainability objectives. As the company’s first North American expansion since 2008, the project needed to accommodate the specialized requirements of a global food manufacturer while maintaining the flexibility of a speculative industrial building.

Solution

An integrated, multidisciplinary approach guided the evolution of the speculative base building into a specialized food production facility for Swiss-based chocolate supplier Barry Callebaut, the development’s first tenant. The design incorporates upgrades to ventilation, life safety systems, and GMP compliance, alongside structural modifications that support Barry Callebaut’s linear processing system. A mezzanine maximizes space for processing and office functions, while careful coordination ensures efficient movement of raw materials, production, and finished goods.

Outcome

Sustainability was a core project focus, with material selection, water management, and high-efficiency ventilation contributing to the facility’s two Green Globes certification. The development reinforces Brantford’s role in expanding the food manufacturing sector, creating 200 new jobs and establishing a responsible industrial presence to support economic growth and investment.

Barry Callebaut manufacturing facility featuring a contemporary industrial façade and landscaped perimeter.

The half-kilometer-long facility is organized around Barry Callebaut’s linear processing system, enabling efficient coordination of raw material intake, production, and finished goods storage.

Acres
K
SF Mezzanine
Jobs Created
Main office entrance with glazing, covered drop-off area, and contemporary industrial design.

Still scrolling? See what’s next.