Located in Inverness, Scotland, Merkinch Primary School was expanded by 11,000 square feet to create a state-of-the-art learning environment and strengthen the school’s role within the local community.
Robertson Construction Northern
Phase 2 (Conversion) – 16,575 SF (1,540 SM)

Challenge
Future-proofing a historic school required balancing contemporary educational needs with the preservation of its Category B listed Victorian heritage. The project also needed to demonstrate a sustainable approach to construction while allowing the existing school to remain operational throughout the building works.
Solution
The extension provides 14 new classrooms, a new ancillary teaching area, three nursing rooms, and a four-court games hall. Designed to complement the original building, the project utilizes cross-laminated timber (CLT) construction, making it one of the largest schools in Scotland to use the low-carbon material. Careful planning enabled construction to proceed alongside ongoing school operations, with temporary accommodation minimizing disruption to students and staff.
Outcome
Developed in collaboration with teachers, students, and community members, the extension creates modern educational spaces while preserving the school’s historic identity. The use of CLT reduces embodied carbon and stores carbon within the building structure, supporting long-term sustainability goals while delivering lasting value for the school and wider community.
The extension adds 14 classrooms, three nursing rooms, an ancillary teaching area, and a four-court games hall to support future growth

One of the largest schools in Scotland to use cross-laminated timber (CLT), the extension significantly reduces embodied carbon while storing carbon within the building structure.