Monifieth Learning Campus

Client Angus Council
Portfolio Education
Category K–12
Services
Size 148,490 SF (13,795 SM)
Location Angus, Scotland, UK
Date 2025

Angus Council in Angus, Scotland is funding a £66.5 million capital investment to embark on its first large-scale Passive House school to replace an existing end-of-life high school. The innovate project is part of Phase Two of the national Learning Estate Investment Programme (LEIP2) meaning that the council will benefit from Scottish Government revenue funding once the project is complete and aligned to the outcomes set out in the LEIP.

Scheduled to open in 2025, the new Monifieth Learning Campus will offer an enhanced learning and teaching experience for 1200 young people that embraces sustainable design and provides community access and opportunities. The key guiding principles for the project are sustainability, equity of access, nurture, inclusion and flexible spaces.  These will help the council meet its ambitions to transition to Net Zero carbon and align to the principles of the Angus Schools for the Future programme.

A flat, open site directly behind the existing school was identified for the new building location, supporting an east west axis that is ideal for Passive House efficiency. This positioning also maximizes the visual connections to the impressive seaward views to the south. The design takes a fabric first approach to achieve an energy performance target of 67kwH/m2/annum. A combination of maximum insulation on the exterior walls and roof, photovoltaic panels, triple-glazed windows, air source heat pumps and a mechanical heat recovery ventilation system are integral to energy performance. The compact rectangular form helps to achieve the greatest efficiencies with a form factor of 1.3.

As the Lead Consultant, stakeholder engagement was vital to the final design to accommodate all requirements. The result is a three-story main block with a single-story block to house the pool and plant accommodation. The main block will house large spaces in the center of the plan including an assembly hall, games and dining hall, with a gym, dance studio and drama studios also being located centrally. Teaching spaces generally and administration offices wrap around the big spaces with efficient circulation between. The building also incorporates an Early Years facility and a large ASN (Additional Support Needs) zone, seamlessly integrated into the design, both with designated outdoor space. Roof lights flood natural light into the central areas via the double and triple height spaces.

The pool is designed as a separate Passive House element but integrated into the overall floor plan of the building. It is directly accessible from the main entrance of the building and has the opportunity to be used outside of school hours.