National Health Service Fife set out to create a Centre of Excellence for orthopedics on the Victoria Hospital campus, where the National Treatment Centre provides dedicated outpatient and inpatient facilities for planned orthopedic care across Kirkcaldy, UK.

Challenge
The design needed to optimize clinical pathways, minimize wait times and staff travel distances, and create a welcoming environment that supports patient wellbeing. Delivering an orthopedic facility on a constrained, active hospital site added a layer of additional challenges to be taken into account.
Solution
As lead consultant, the design for the new three-story building is positioned to maximize daylight, views, and access to therapeutic outdoor spaces. The facility includes outpatient treatment and imaging services, three surgical theatres, 34 inpatient rooms, short-stay ward spaces, and staff amenities. Pocket spaces at the ends of corridors provide informal consulting and social areas, while a variety of seating types and integrated artwork contribute to a positive healing environment.
Outcome
Passive sustainability measures were prioritized throughout the design, with a highly insulated and airtight building envelope minimizing energy loss and supporting long-term operational efficiency. The building’s thermal model mitigates overheating from solar and occupant gain, while material choices reflect simplicity, longevity, and efficiency.
Virtual reality, interactive 3D walkthroughs, and technical workshops with clinicians were used to test room layouts, patient flow, and departmental adjacencies before finalizing the building design.

Warm colours and timber identify patient-facing spaces throughout the building
Efficient clinical pathways reduce staff walking distances
A variety of seating options gives patients and visitors space to sit individually or gather in groups
The building was positioned within a constrained site to maximize daylight, views, and access to therapeutic outdoor spaces
