Canada Post Corporation EV Charging Station Program
Client | JLL Real Estate Services Ltd. and Canada Post |
---|---|
Portfolio | Transportation |
Services | |
Size | 10,000 SF – 60,000 SF (929 SM – 5574 SM) |
Location | Multiple Locations, Canada |
Date | 2030 |
Canada Post Corporation (CPC), the primary postal operator in Canada, committed to the electrification of its fleet of nearly 14,000 vehicles, with a target of 50 per cent electric vehicles by 2030, and 100 per cent by 2040. The electrification will help to achieve a more comprehensive goal of achieving net-zero greenhouse gas (GHG) emissions by 2050. To plan for the long-term greening of the commercial fleet, JLL Real Estate, the facility group that manages the CPC portfolio, engaged with Cion and its sister company NORR, to perform feasibility studies at more than 90 locations across Canada.
The feasibility studies are an integral element of the phased planning process to design and build electric vehicle charging stations. The on-site investigations captured existing conditions on a wide range of elements from incoming service ratings and service type (underground or overhead service) to utility transformer size and peak demand from hydro data. Consultative investigations also identified potential physical challenges for upgrades at existing operational and maintenance buildings such as service equipment space limitations, site limitations for underground works and distance to the power grid. As well, information about the source and quality of the power from the existing grid was documented. The objective was to confirm and consult on existing electrical infrastructure to define final requirements for the zero-emission vehicle infrastructure strategy for Canada Post – including infrastructure upgrades for future growth.
The scope of work comprised of feasibility studies for a large portfolio of facilities that are both high security level and operational. In addition, we were awarded design and construction administration packages for three facilities in British Columbia. Close collaboration with CPC, JLL, provincial utilities companies, Cion and NORR was a key success factor.
Get In Touch
-
Principal, Transportation, North America
Download Project Overview
Other Projects in this Portfolio
Union Station Revitalization Project
An extraordinary architecture and engineering revitalization at Canada’s busiest transit hub
Eglinton Crosstown Transit Stations
Designing modern underground transit stations for Toronto’s rapid transit network
Stage 2 O-Train South Extension Project
A new era of aboveground LRT stations
Brodick Ferry Terminal
New terminal building for one of Scotland’s busiest ferry routes