UPS Last Mile Package Delivery Facility

Client Blue Rock Construction
Portfolio Industrial
Services
Size 1,004,400 SF (93,000 SM)
Location Philadelphia, PA, US
Date TBD

NORR was selected by Commercial Development Corporation and Blue Rock Construction for the design and documentation of a purpose-built one-million-square-foot last mile package delivery facility in Philadelphia, PA.  This strategic location will enable UPS to expand its reach to multiple cities in the Northeast, a significant value based on the increasing demand for same-day delivery service. Set on a former golf course on one of the largest available industrial sites in the city, the highly automated and state-of-the-art facility will support an expanding distribution network closer to their customers.

Designed to efficiently work with the operational and sustainability requirements of UPS, the precast concrete structure will have a 36-foot clear interior height featuring clear story windows for maximum natural light. The design supports all elements of complex operations including a conveyor system, automated control room and an enclosed auto shop for truck maintenance. The facility will be equipped with 245 interior and exterior loading positions, including drive-in docks, fully equipped doors and dock equipment to enable the increased efficiency of package delivery to customers in the Philadelphia region and beyond

Office space is integral in the design with five separate clusters within the facility.  Amenity spaces feature locker rooms, break rooms and training rooms for the 1,000 UPS employees.   Two “out” concrete buildings will achieve program requirements for an employee entrance and retail outlet.

Sustainability components were purposeful in the holistic design. The structure will accommodate servicing natural gas delivery vehicles, with a move to electric in the future to reduce pollution.  As well, the structure will be constructed to accommodate solar panels on the roof.

Client Blue Rock Construction
Portfolio Industrial
Services
Size 1,004,400 SF (93,000 SM)
Location Philadelphia, PA, US
Date TBD

Get In Touch

  • Steve Kopp

    Vice President, Industrial, North America

Download Project Overview

Other Projects in this Portfolio

The Cairn Distillery

Spirited new distillery blends tradition with modern sustainability in Speyside

Bradford Energy Centre

Design for Low-to-Zero Energy Centre in Bradford, West Yorkshire, UK

555 Beck Crescent

A modern industrial, distribution and logistics hub in Ajax, ON

The Scapa Noust

Scapa Noust Whisky Tasting Room Embodies Iconic Scottish Landscape and Spirit